elecena.pl

STGYA50M120DF3 Trench gate field-stop, 1200 V, 50 A, low-loss M series IGBT in a Max247 long leads package

STMicroelectronics

RSS 5.66 5.66 USD23.00 PLN
  • Sklep zagraniczny
MPN:
STGYA50M120DF3
Producent:
STMicroelectronics
Waluta:
dolar amerykański
Dodany do bazy:
Ostatnio widziany:
Zmiana ceny:
-2.75% (13.11.2025)
Poprzednia cena:
5.82 USD
Ilość [ x szt]: 10+ 120+
Cena USD [za szt]: 3.97 3.73

This device is an IGBT developed using an advanced proprietary trench gate field-stop structure. The device is part of the M series IGBTs, which represent an optimal balance between inverter system performance and efficiency where the low-loss and the short-circuit functionality is essential. Furthermore, the positive VCE(sat) temperature coefficient and the tight parameter distribution result in safer paralleling operation.

Elecena nie prowadzi sprzedaży elementów elektronicznych, ani w niej nie pośredniczy.

Produkt pochodzi z oferty sklepu