STGWA40IH65DF Trench gate field-stop 650 V, 40 A, soft-switching IH series IGBT in a TO-247 long leads package
STMicroelectronics
RSS
4.13 USD16.78 PLN
Przejdź do sklepu »
- Sklep zagraniczny
- MPN:
- STGWA40IH65DF
- Producent:
- STMicroelectronics
- Waluta:
- dolar amerykański
- Dodany do bazy:
- Ostatnio widziany:
- Zmiana ceny:
- -1.9% (14.07.2025)
- Poprzednia cena:
- 4.21 USD
| Ilość [ x szt]: | 10+ | 100+ |
|---|---|---|
| Cena USD [za szt]: | 2.28 | 1.63 |
Sugerowane produkty dla stgwa40ih65
The newest IGBT 650 V soft-switching IH series has been developed using an advanced proprietary trench gate field-stop structure, whose performance is optimized both in conduction and switching losses for soft commutation. A freewheeling diode with a low drop forward voltage is included. The result is a product specifically designed to maximize efficiency for any resonant and soft-switching applications.
Elecena nie prowadzi sprzedaży elementów elektronicznych, ani w niej nie pośredniczy.
Produkt pochodzi z oferty sklepu STMicroelectronics