STGWA75H65DFB2 Trench gate field-stop, 650 V, 75 A, high-speed HB2 series IGBT in a TO-247 long leads package
STMicroelectronics
RSS
Sample
Przejdź do sklepu »
- Darmowa próbka
- MPN:
- STGWA75H65DFB2
- Producent:
- STMicroelectronics
- Dodany do bazy:
- Ostatnio widziany:
- Zmiana ceny:
- +12% (08.10.2026)
- Poprzednia cena:
- 5.77
| Ilość [ x szt]: | 10+ | 100+ |
|---|---|---|
| Cena USD [za szt]: | 4.03 | 3.50 |
Sugerowane produkty dla stgwa75h65dfb2
The newest IGBT 650 V HB2 series represents an evolution of the advanced proprietary trench gate field-stop structure. The performance of the HB2 series is optimized in terms of conduction, thanks to a better VCE(sat) behavior at low current values, as well as in terms of reduced switching energy. A very fast soft recovery diode is co-packaged in antiparallel with the IGBT. The result is a product specifically designed to maximize efficiency for a wide range of fast applications.
Elecena nie prowadzi sprzedaży elementów elektronicznych, ani w niej nie pośredniczy.
Produkt pochodzi z oferty sklepu STMicroelectronics