STGWA25IH135DF2 Trench gate field-stop 1350 V, 25 A, soft-switching IH2 series IGBT in a TO-247 long leads package
STMicroelectronics
RSS
Sample
Przejdź do sklepu »
- Darmowa próbka
- MPN:
- STGWA25IH135DF2
- Producent:
- STMicroelectronics
- Dodany do bazy:
- Ostatnio widziany:
- Zmiana ceny:
- +2.95% (29.05.2026)
- Poprzednia cena:
- 3.39
| Ilość [ x szt]: | 10+ | 120+ |
|---|---|---|
| Cena USD [za szt]: | 2.37 | 2.05 |
Sugerowane produkty dla stgwa25ih135df2
The newest IGBT 1350 V IH2 series has been developed using an advanced proprietary trench gate field-stop structure, whose performance is optimized both in conduction and switching losses for soft commutation. A freewheeling diode with a low drop forward voltage is included. The result is a product specifically designed to maximize efficiency for any resonant and soft-switching applications.
Elecena nie prowadzi sprzedaży elementów elektronicznych, ani w niej nie pośredniczy.
Produkt pochodzi z oferty sklepu STMicroelectronics