LED 1 x 5mm red stackable (long leads)
Silicon Ark
RSS
0.21 GBP1.09 PLN
- Sklep zagraniczny
- Kod:
- 764
- Producent:
- GENERIC
- Waluta:
- funt szterling
- Dodany do bazy:
- Ostatnio widziany:
Sugerowane produkty dla palcement
LED 1 x 5mm red stackable for bargraph with long (normal length) leads.
Unique design allowing for custom made bargraph displays, typical use in mixing desks VU meters /. graphic display models.
These LEDs interlock along the long axis making a seamless infinite length display possible. Or can be stacked normally. (please see example)
each face 5 x 1mm nom. (4.9 x 0.96 actual) stepped at 3.6mm down from top face to 3.5mm x 5.4mm interlocking profile ( please see drawing)
(all dimensions approximated) but would suggest that a milled slot in a front panel of 1mm will allow for a neat fit. If the panel was 3.5 mm thick itself then these would fit flush due to the step.
This step also allows for easy palcement and fixing ( silicon glue /glue gun). lead length: to 24 / 25mm mm on 2.5mm pitch
Elecena nie prowadzi sprzedaży elementów elektronicznych, ani w niej nie pośredniczy.
Produkt pochodzi z oferty sklepu Silicon Ark