STGWA20HP65FB2 Trench gate field-stop, 650 V, 20 A, high speed HB2 series IGBT in a TO-247 long leads package
STMicroelectronics
Przejdź do sklepu »
- Sklep zagraniczny
- MPN:
- STGWA20HP65FB2
- Producent:
- STMicroelectronics
- Waluta:
- dolar amerykański
- Dodany do bazy:
- Ostatnio widziany:
- Zmiana ceny:
- -4.79% (05.07.2025)
- Poprzednia cena:
- 3.34 USD
| Ilość [ x szt]: | 10+ | 100+ |
|---|---|---|
| Cena USD [za szt]: | 2.00 | 1.51 |
Sugerowane produkty dla stgwa20hp65fb2
The newest IGBT 650 V HB2 series represents an evolution of the advanced proprietary trench gate field-stop structure. The performance of the HB2 series is optimized in terms of conduction, thanks to a better VCE(sat) behavior at low current values, as well as in terms of reduced switching energy. A diode used for protection purposes only is co-packaged in antiparallel with the IGBT. The result is a product specifically designed to maximize efficiency for a wide range of fast applications.
Elecena nie prowadzi sprzedaży elementów elektronicznych, ani w niej nie pośredniczy.
Produkt pochodzi z oferty sklepu STMicroelectronics