STGYA75H120DF2 Trench gate field-stop 1200 V, 75 A, high-speed H series IGBT in a Max247 long leads package
STMicroelectronics
RSS
9.54 USD38.76 PLN
Przejdź do sklepu »
- Sklep zagraniczny
- MPN:
- STGYA75H120DF2
- Producent:
- STMicroelectronics
- Waluta:
- dolar amerykański
- Dodany do bazy:
- Ostatnio widziany:
- Zmiana ceny:
- +16% (16.07.2026)
- Poprzednia cena:
- 8.21 USD
| Ilość [ x szt]: | 10+ | 120+ |
|---|---|---|
| Cena USD [za szt]: | 5.61 | 5.21 |
Sugerowane produkty dla stgya75h120df2
This device is an IGBT developed using an advanced proprietary trench gate field-stop structure. This device is part of the H series of IGBTs, which represent an optimum compromise between conduction and switching losses to maximize the efficiency of high switching frequency converters. Moreover, a slightly positive VCE(sat) temperature coefficient and very tight parameter distribution result in safer paralleling operation.
Elecena nie prowadzi sprzedaży elementów elektronicznych, ani w niej nie pośredniczy.
Produkt pochodzi z oferty sklepu STMicroelectronics