Intelligent Power Module (IPM), 600 V, 10 A, Long lead
onsemi
- Darmowa próbka
- MPN:
- NFAQ1060L33T
- Producent:
- onsemi
- Dodany do bazy:
- Ostatnio widziany:
Sugerowane produkty dla nfaq1060l33t
The NFAQ1060L33T is a fully-integrated inverter power stage consisting of a high-voltage driver, six IGBT’s and a thermistor, suitable for driving permanent magnet synchronous (PMSM) motors, brushless-DC (BLDC) motors and AC asynchronous motors. The IGBT’s are configured in a 3-phase bridge with separate emitter connections for the lower legs for maximum flexibility in the choice of control algorithm.The power stage has a full range of protection functions including cross-conduction protection, external shutdown and under-voltage lockout functions. An internal comparator and reference connected to the over-current protection circuit allows the designer to set the over-current protection level.
Elecena nie prowadzi sprzedaży elementów elektronicznych, ani w niej nie pośredniczy.
Produkt pochodzi z oferty sklepu onsemi