elecena.pl

SCTWA30N120 Silicon carbide Power MOSFET 1200 V, 80 mOhm typ., 45 A in an HiP247 long leads package

STMicroelectronics

RSS 23.51 23.51 USD95.52 PLN
  • Sklep zagraniczny
MPN:
SCTWA30N120
Producent:
STMicroelectronics
Waluta:
dolar amerykański
Dodany do bazy:
Ostatnio widziany:
Zmiana ceny:
+6% (20.08.2025)
Poprzednia cena:
22.23 USD
Ilość [ x szt]: 10+ 100+
Cena USD [za szt]: 17.46 15.82

This silicon carbide Power MOSFET is produced exploiting the advanced, innovative properties of wide bandgap materials. This results in unsurpassed on-resistance per unit area and very good switching performance almost independent of temperature. The outstanding thermal properties of the SiC material allow designers to use an industry-standard outline with significantly improved thermal capability. These features render the device perfectly suitable for high-efficiency and high power density applications.

Elecena nie prowadzi sprzedaży elementów elektronicznych, ani w niej nie pośredniczy.

Produkt pochodzi z oferty sklepu