STWA60N043DM9 N-channel 600 V, 38 mOhm typ., 55 A MDmesh DM9 Power MOSFET in a TO-247 long leads package
STMicroelectronics
Przejdź do sklepu »
- Darmowa próbka
- MPN:
- STWA60N043DM9
- Producent:
- STMicroelectronics
- Dodany do bazy:
- Ostatnio widziany:
- Zmiana ceny:
- -6% (12.09.2025)
- Poprzednia cena:
- 11.32
| Ilość [ x szt]: | 10+ | 120+ |
|---|---|---|
| Cena USD [za szt]: | 7.47 | 6.81 |
Sugerowane produkty dla stwa60n043dm9
This N-channel Power MOSFET is based on the most innovative super-junction MDmesh DM9 technology, suitable for medium/high voltage MOSFETs featuring very low RDS(on) per area coupled with a fast-recovery diode. The silicon-based DM9 technology benefits from a multi-drain manufacturing process which allows an enhanced device structure. The fast-recovery diode featuring very low recovery charge (Qrr), time (trr) and RDS(on) makes this fast-switching super-junction Power MOSFET tailored for the most demanding high-efficiency bridge topologies and ZVS phase-shift converters.
Elecena nie prowadzi sprzedaży elementów elektronicznych, ani w niej nie pośredniczy.
Produkt pochodzi z oferty sklepu STMicroelectronics