elecena.pl

STGWA30M65DF2 Trench gate field-stop IGBT M series, 650 V 30 A low loss in a TO-247 long leads package

STMicroelectronics

RSS 2.88 2.88 USD11.70 PLN
  • Sklep zagraniczny
MPN:
STGWA30M65DF2
Producent:
STMicroelectronics
Waluta:
dolar amerykański
Dodany do bazy:
Ostatnio widziany:
Zmiana ceny:
-8% (30.11.2024)
Poprzednia cena:
3.12 USD

These devices are IGBTs developed using an advanced proprietary trench gate field-stop structure. The devices are part of the M series IGBTs, which represent an optimal balance between inverter system performance and efficiency where the low-loss and the short-circuit functionality are essential. Furthermore, the positive VCE(sat) temperature coefficient and the tight parameter distribution result in safer paralleling operation.

Elecena nie prowadzi sprzedaży elementów elektronicznych, ani w niej nie pośredniczy.

Produkt pochodzi z oferty sklepu